Case study: High Speed System – Rome – Naples
Objective: Analysis of risk in terms of physical infrastructure and technological safety with specific attention paid to:
- Stations.
- Running lines.
- Tunnels and Viaducts.
- Command and Control Posts.
- Technological Areas.
- Telecommunications Infrastructure.
Phase 1 Analysis of the State of the Art
Research on the regulations, systems and laws existing in Italy, European countries, and the world regarding transportation.
Phase 2 Instruments – Methodologies
Implementation of an IT instrument for the evaluation of the vulnerability of a system and cost/benefit analysis of security apparatuses.
Phase 3 – Applications – Project Output
Proposal of a group of rules for the definition of regulatory guidlines for rail security.
NITEL – RFI – ANSALDO STS – ELSAG – SCIRO – SELEX SISTEMI